RK-23A/RK65A – Reconstruction and Rehabilitation of the Manhattan Approach Ramps of the Robert F. Kennedy Bridge

May 11, 2017

• Removal and disposal asbestos containing (ACM) wire from both sides of bridge.

• Removal of (ACM) pitch pockets on toll booth roofs.

• Removal and disposal of Universal Waste.

RK-65A BRONX PLAZA/STRUCTURE REHABILITATION AT THE RFK BRIDGE

November 09, 2015

Removal of the following Asbestos Containing items:

• ACM Pipe insulation and   Lead Based Paint

• Black conduit liner material

• Black mastic joint sealant

• Slip Sheet

• Insulators, arc shields, bakelite partitions and ebony panels

• Exhaust pipe and wire insulation

• Underground utilities (Water Main pipes)

• Underground utilities (Sewer pipes)

• Underground utilities (Electrical insulation)

RK-23A RECONSTRUCTION & REHABILITATION OF THE MANHATTAN APPROACH RAMPS TO THE RFK BRIDGE

January 21, 2016

• Removal and disposal of asbestos containing; pipe insulation, transite pipe, vibration damper, waterproofing and mastic.

Please reload

A FEW OF OUR CLIENTS

Bronx Office Location:
169 Lincoln Avenue, Suite 204
Bronx, NY 10454
(718) 401-2744

Manhattan Office Location:
353 West 48th Street, 4th Floor
New York, NY 10036
(800) 659-7209

Brooklyn Office Location:
41Flatbush Avenue
1st Floor - #821
Brooklyn, NY 11217
(718) 732-8807

Local Residential Services: www.pdsnys.com

bottom of page